Survey
The simpliest way is to implement survey by conventinal tools, such as measure tape, telemeter, etc. Upon the result data we draw the sketch and then process them for the facility department. The main phases are:
- on site inspection
- Drawing sketches
- Survey, data entrace
- ProcessSupervisory